RU   EN

In 2017:

  • Brought into commission 502,35 km of rail tracks;
  • Constructed and reconstructed 62 bridges;
  • Installed 1264,39 km of high-voltage power transmission lines;
  • Installed 15387,65 km of signaling, centralization and interlocking systems.